The result is that Primavera P6 is the preferred project management software used by over 75,000 companies worldwide to manage projects, programs, and portfolios. The combination of powerful critical path analysis and customizable coding structure makes Primavera P6 the most common engineering and construction planning and execution tool. It records the agreed project contracts dates. Primavera P6 is a database system that codes and records the logic networks on complex scopes of work. These software tools are designed for communication in small teams. It is not a visual communication tool or a workflow management system such as Wrike, LeanKit, Trello or Asana. Primavera P6 is used to identify the critical path of large engineering projects and manage changes to the design and construction strategies over the life of the project. In fact, it is hard to think of another software system, aside from Microsoft Excel that is as commonly used across the process and heavy industrial engineering sector as Primavera P6. It is the most common critical path based planning software used in planning and executing large engineering projects. I’ve been working in the oil and gas industry with Primavera P6 for six years years.